Lock Search Group has launched Lockin AI—our proprietary AI platform that connects us with top clients and premium opportunities

Discover Lockin AI

Navigating Toronto office to residential conversions amid downtown vacancy

Downtown Toronto feels different in 2025. Morning crowds are thinner, cafés stay half-empty past nine, and mid-century towers along Bay Street display entire floors of vacancy. As owners debate their next move, developers and our Toronto recruiters see a rare alignment: the city needs housing, landlords need an exit, and new incentives finally reward conversions from office to residential.

Vacancy pressure is reshaping Bay Street

Colliers’ Q2 2025 snapshot puts downtown office vacancy at 16.3 percent, with Class AAA towers near capacity while B-grade buildings struggle. National figures from Altus Group, which peg overall availability at 16.6 percent, confirm that tenants are clustering in premium space and letting older assets lapse. RENX observes that trophy landlords remain optimistic, but everyone else is looking for a plan B. For many owners, a residential conversion is that plan.

Why some towers are ideal for conversion

Not every office can morph into apartments. Research by the Urban Land Institute lists three critical factors: shallow floor plates that bring daylight to bedrooms, a concrete core that can accept new risers, and façades that allow operable windows. A City Planning assessment finds about 3.5 million square feet downtown meeting those criteria—enough raw volume for roughly 6,000 apartments without a single excavation. Because demolition, shoring, and most utilities already exist, conversions typically open 18 to 24 months sooner than ground-up builds.

City incentives and provincial reforms

In November 2024 the Planning and Housing Committee approved an office-replacement framework that lets developers skip the one-for-one job-space rule if they deliver affordable rental units and keep active ground floors. Bill 102, now in third reading at Queen’s Park, would exempt vertical conversions from Record of Site Condition filings that often add two full years to a schedule. Storeys estimates that the combined policy package can cut overall timelines by about 30 percent and trim soft costs by millions.

Case study: 1 St. Clair West

Slate Asset Management’s makeover of a 1960s, twelve-storey tower near Yonge and St. Clair proves the thesis. The team kept 70 percent of the concrete frame, replaced single-pane windows with a high-performance curtain wall, and threaded new plumbing risers through redundant service shafts. Reusing the structure cut roughly 40,000 tonnes of embodied carbon, unlocked two extra residential floors, and will deliver 257 rental units plus 4,500 square feet of retail in late 2025.

Financing the stack without costly delays

Lenders treat conversions as construction risk, not income risk. Owners often amend existing office loans, adding construction tranches while retaining favourable rates. Credit committees usually want three things in place before funding: a guaranteed-maximum-price contract with a design-build partner, a Canada Mortgage and Housing Corporation insured take-out for the residential portion, and at least one signed lease for the ground-floor commercial bay. When those items combine with the City’s Open Door tax and fee waivers, the capital stack can lower effective costs by as much as CAD 60 per square foot.

Engineering challenges that demand specialised leadership

Complexity multiplies once walls come down. Construction managers must sequence tenant decommissioning, asbestos abatement, and phased fit-outs without exposing structural steel to winter moisture. Mechanical engineers need to reroute services so every apartment has independent HVAC and plumbing, and envelope specialists must meet Tier 2 of the Toronto Green Standard using concrete poured half a century ago. Boards now budget for on-call façade engineers and code consultants from day one because headline risk is real.

Talent strategy for multi-tower pipelines

Developers chasing more than one conversion soon realise that hiring timelines compete directly with financing milestones. An executive search partner maps skill gaps against the critical path so that key hires such as a design-build director, municipal affairs lead, and lease-up manager arrive before drawings are locked. Leaders with completed conversions on their résumés command premiums of 15 to 20 percent over conventional multifamily peers and often negotiate milestone bonuses rather than a single completion payout.

Timeline watchpoints

  • Months 0 – 6: Feasibility study, tenant relocation, and decommissioning.
  • Months 7 – 12: Rezoning approval, detailed design, and capital structuring.
  • Months 13 – 24: Strip-out, structural reinforcement, and new core services.
  • Months 25 – 36: Interior fit-out, occupancy, and lease-up.

Managing community optics

Residents often worry about job losses and canyon shadows, so early engagement is essential. Successful proponents run walking tours with Business Improvement Areas, post interactive daylight studies online, and allocate public amenities in their Section 37 packages. When in-house teams lack that communications muscle, boards bring in interim community-relations directors for the rezoning window.

The road ahead

Office vacancy will not collapse overnight, yet plateauing rates suggest the market has reached equilibrium. Policy tools are ready, capital is patient, and design playbooks are proven. What remains is talent. Leaders who can guide aging towers through structural retrofits, intricate regulations, and neighbourhood expectations will decide whether Toronto’s conversion wave becomes a trickle or a genuine housing breakthrough.

Our Toronto Office